Integrations

Linear, Asana, monday, ClickUp, Trello and Azure DevOps: Tasks and Hours in SLAtech Vantage

Six task trackers, read-only, with consistent rules for statuses and time tracking.

SLAtech Vantage reads tasks from Linear, Asana, monday.com, ClickUp, Trello and Azure DevOps Boards and turns them into project tasks with their status and, where supported by the tracker, comments and hours with a rate. Nothing is written back to the tracker. Each connection covers one team, project, board or list, and the sync runs once a day, at night. Our team sets up the connection.

Which trackers, and what each connection requires

  • Linear: one team, by its key (the prefix before the task number, for example ABC), and a personal API key.
  • Asana: one project, by its project ID, and a personal access token.
  • monday.com: one board, by its board ID, and an API token.
  • ClickUp: one list, by its list ID, and an API token.
  • Trello: one board, by its board ID, an API key and a token.
  • Azure DevOps: the work items of one project: organization, project and a personal access token (PAT). Repositories and pipelines are not read here.

The connection check accesses the selected team, project, board or list and shows its name and, for most trackers, how many tasks it holds.

What comes in from each tracker

Each tracker provides the title, description, status and the task creator, if available. Beyond that they differ:

  • Comments: from Linear, Trello and Azure DevOps. Linear and Trello bring up to 50 comments per task. Comments in Asana, monday and ClickUp are not read.
  • Hours: from ClickUp, every time entry on its own, with its author and day. From Azure DevOps (Completed Work) and monday (the time tracking column), only a total per task, with no person and no day of work. Linear, Asana and Trello have no hours; those come from a time tracker.
  • Estimate: from ClickUp and Azure DevOps (Original Estimate), in hours, if the task has none yet. Linear estimates are points, so they are not used.
  • Not read from any tracker: attachments and due dates.

How a tracker status becomes a work status

In a normal workflow every status falls into one of three groups: not started, in progress, finished. In Linear, ClickUp and Azure DevOps a status has a type, and the group follows it. In Asana (the section name), monday (the first status column) and Trello (the list name), the group is read from the words in the name, in Hebrew, English and Russian, and an unrecognized name counts as "not started".

  • Cancellation in Linear is handled separately: a cancelled task becomes Declined, not Done, so cancelled work does not look like finished work.
  • A task that is Waiting for the client here stays that way until the tracker closes it: an "in progress" status from the tracker does not clear the wait.

Hours from a tracker: who, which day and what rate

  • A ClickUp time entry is recorded against its original date. Its author is matched by email. With no match, the hours come in without a person, at the project rate.
  • Totals from Azure DevOps and monday: on every sync, the difference between the tracker's total and what is already recorded is written as one line for the current month. If the total went down, a negative correction goes into the current month.
  • The rate is stored on the line of hours itself, so later rate changes do not alter existing time entries.
  • A submitted or accepted month does not change. A ClickUp entry dated in such a month does not come in. Any difference in a total is carried forward to the next open month.
  • Linear has no time logging. Hours are logged in a time tracker, with the task key, for example ABC-123, in the entry description. That is how the hours reach the task.

What the client sees, and what is not imported

In the portal the client sees the tasks that came from the tracker, their status and the hours on them, like any other task in the project.

  • Read-only. Status changes, comments and hours are not written back to any of the six trackers.
  • Attachments and due dates are not transferred today.
  • The sync runs once a day, at night.
  • Disconnecting removes the connection and its key. Tasks and hours that already came in stay in the project, and nothing changes in the tracker itself.
  • The project sources screen, where the details are entered, is open today to the system operator only, so our team sets up the connection.

Frequently asked questions

Does SLAtech Vantage change anything in Linear, Asana, monday, ClickUp, Trello or Azure DevOps?
No. All six connections are read-only: SLAtech Vantage reads tasks, comments and hours, and does not change a status, add a comment or log hours in the tracker. Changes made to the task in SLAtech Vantage are not sent back to the source tracker.
Linear has no time logging. Where do the hours come from?
From a time tracker such as Toggl, Clockify or Harvest. Whoever logs the time writes the Linear task key, for example ABC-123, in the entry description, and the hours attach to that task in the project. A number without a prefix is a description, not a reference.
Why do hours from monday and Azure DevOps have no author and no day?
Both trackers give a task only one total of time spent. At each sync, SLAtech Vantage records the difference between the latest total and the time already recorded, in the current open month. Submitted months remain unchanged, but the original work dates cannot be determined from that total. A breakdown by person and day comes from ClickUp, Jira or a time tracker.
What happens to a task cancelled in Linear?
It becomes Declined, not Done. In Linear, cancelled is a status type of its own, and SLAtech Vantage tells it apart so that a cancelled task does not look like finished work.

Want to see tasks from your tracker next to the hours and the monthly report? You can start with a trial.

Start a free trial